Below are some additional pictures after the paving project was completed Aug 8, 2008.

   

In a lot of places concrete is out in the road    Old Pavement was really thin in a many places.

   

Removing the pavement along the edge             Trying to get the blacktop but not concrete

   

Picking up pieces of blacktop                            One side down the other side is really narrow

 

   

Barely room for truck to get by                             Verifying the depth of blacktop installed

        

Rolling started again while the blacktop is really hot.  

---------------------------------------------------------------------------------------------------------------------------------------------

The following pictures were taken August 9, about 2 hours after ORO had a really good rain.

    

     View toward Boulevard from edge of horse shoe area

   

View from Clubhouse exit to Boulevard                        What used to be the bumpiest area in the park.

   

Closer view of former rough area                                Milling placed in storage area.

   

Millings placed in storage area                                        Extra loose blacktop placed at air hose area

   

Entrance to Maintenance Area                                    Along Side of sewer plant

   

Storage area leading to Roger's Building                            Along front of storage in Maintenance area